Winter is officially here with temps dipping below freezing on a regular basis. So it's time to get started on some of the bigger projects I have been planning for the CB.
Removed the wheels for powdercoating:
Stripped them down, pulled off everything and yanked the bearings. Off to the powdercoater this weekend for both wheels and the hand grabs. Gloss black to match the frame.
Next up is fork springs and fork oil service. Also planned: 19T front sprocket, new chain, winter service (oil, filter, brake/clutch fluid and plugs) and a few other smaller items.